Port Overview
Nepal is a land-locked country and relies on the Kolkata Port in India to handle practically all of its imports by sea. Birgunj dry port is the only Rail based ICD at Sirsiya, in Madhesh Province is one of five dry ports (referred to by the Nepal Intermodal Transport Development Board (NITDB) as Inland Clearance Depots, ICDs) currently active in the country. An addition at the Birgunj ICD is the Birgunj Integrated Check Post (ICP) to facilitate customs clearance activities. The purpose of the ICP is to integrate efficient customs clearance processes at the authorized border crossing points to facilitate the clearance of cargo and people in support of trade between Nepal and India. The ICD and ICP facilities are located next to each other at the border. The facilities are awarded by the Nepal Intermodal Transport Development Board to Pristine Valley Dryport Pvt. Ltd for the ICD Birgunj, Sirsiya on 8th July 2021, and TRS Himalayan Logipark (P) Ltd for ICP Birgunj terminal clearance purposes on 1st April 2023. NITDB: http://nitdb.gov.np/en/
The top three land border crossings in Nepal in terms of import and export value are (1) Birgunj (Madhesh Province): 32.82% of import share (2) Bhairahawa (Lumbini Province): 15.19% of import share (3) Biratnagar (Koshi Province): 11.57% of import share value during Mid-July 2022-Mid-July 2023. (Ref: https://www.customs.gov.np)
Birgunj Inland Container Depot (ICD) at Sirsiya
The Inland Clearance Depot (ICD) at Sirsiya, Birgunj is the first terminal in Nepal linked by rail to India and designed to handle the transportation and transshipment of goods between seaports and inland destinations of Nepal. NITDB awarded Pristine Valley Dryport Pvt. Ltd. the contract to operate and manage the Inland Clearance Depot in Sirsiya. It facilitates the direct movement of containers and break-bulk cargo from Kolkata port and other places in India. The ICD has six full-rake railway sidings. It handles more than 20,000 TEU (Twenty-Foot Equivalent Unit) annually. It can store up to 1,568 TEU. It has been constructed on 38 ha (94 acres) land.
Port Website: Birgunj ICD
Key port information may also be found at http://www.maritime-database.com
Port Location and Contact |
|
---|---|
Country |
Nepal |
Province or District |
Madhesh Province |
Nearest Town or City with Distance from Port |
TOWN NAME: Birgunj DISTANCE (km): 8 KM |
Port's Complete Name |
Sirsiya Inland Container Depot |
Latitude |
27.02421 |
Longitude |
84.85377 |
Managing Company or Port Authority
|
Pristine Valley Dryport Pvt. Ltd. for ICD
Nepal Intermodal Transport Development Board |
Management Contact Person |
Tanka Raj Joshi, 9845886544
|
Nearest Airport and Airlines with Frequent International Arrivals/Departures |
AIRPORT NAME: Simara Airport 23.4 KM |
Port Picture
Pic: Ariel view of Birgunj ICD |
Description and Contacts of Key Companies
-
Container Corporation of India Ltd. (CONCOR) is an Indian public sector company currently engaged in India in the business of providing terminal services and facilities for handling and transportation of containerized cargo by rail, road and coastal shipping, and intermodal logistics services for aggregation and distribution of cargo.
(2) Valley Groups as Nepalese Partner Company.
(3) Rivro Logistics Pvt. Ltd. is in the business of transit cargo and warehouse management at the Kolkata and Haldia port in India and in Raxaul, Birgunj, and Kakervitta in Nepal, it also provides clearing and forwarding services to public sector undertakings in Nepal for exports from and imports into Nepal.
For more information on port contacts, please see the following link: HQ staff will input a link to section 4.4 Port and Waterways Companies Contact List here.
Port Performance
During June through August, when it is the monsoon season, the dry port is less busy. During festival season (Dashain, Tihar, Chhath in October/November) the dry port is very busy. From December through February, when it is the winter season, the dry port is most busy, because companies start restocking goods after the monsoon season and stockpiling goods for the winter season. The dry port can be congested during these months.
Seasonal Constraints |
||
---|---|---|
|
Occurs |
Time Frame |
Rainy Season |
Yes |
From June to August |
Major Import Campaigns |
Yes |
Festival season in October/November |
Other Comments |
N/A |
Handling Figures for 2022 |
|
---|---|
Vessel Calls* |
N/A |
Container Traffic (TEUs) |
55504 Imports 1200 Export |
*Number of Trains: 641 (in 2022 A.D.)
Handling Figures Bulk and Break Bulk for 2022 |
|
---|---|
Bulk (MT) |
520257 |
Breakbulk (MT) |
232198 |
Discharge Rates and Terminal Handling Charges.
Following is the tariff charged by the Terminal handling company:
Pristine Valley Dry Port Pvt. Ltd. |
||
---|---|---|
Inland Clearance Depot, ICD Birgunj, Sirsiya Dryport, Parsa, Nepal PAN: 609754971 |
||
ICD Address: Sirsiya Dryport, ICD Birgunj, Parsa, Nepal |
||
Terminal Tariff with effect from 07-Aug-2020 and remain valid till further notification |
||
Description of Activities |
Amount in (NPR) |
|
20' |
40' |
|
IMPORT - Terminal Handling Charges |
|
|
Factory Destuffing |
7,054.30 |
9,716.30 |
ICD Destuffing |
9,111.30 |
12,136.30 |
Warehouse Delivery |
9,111.30 |
12,136.30 |
EXPORT - Terminal Handling Charges |
|
|
Factory Stuffing |
7,054.30 |
9,716.30 |
ICD Stuffing |
9,111.30 |
11,033.00 |
Warehouse Delivery |
9,111.30 |
11,033.00 |
|
|
|
Import warehouse charges |
Per day Per MT |
|
1 to 3 days |
Free |
|
4th to 10th day |
93.17 |
|
11th to 30th day |
119.79 |
|
31st day onwards |
186.34 |
|
Export warehouse charges |
Per day Per MT |
|
1 to 3 days |
Free |
|
4th to 10th day |
53.24 |
|
11th to 30th day |
66.55 |
|
31st day onwards |
93.17 |
|
Open Yard Charges - Container |
Per day Per MT |
|
1st day (Date of unloading) |
Free |
|
2nd to 7th day |
53.24 |
|
8th day onwards |
79.86 |
|
Container Parking Charges (Loaded/Empty) |
Per day Per Container |
|
1st day (Date of unloading) |
Free |
Free |
2nd to 7th day |
219.62 |
292.82 |
8th day onwards |
292.82 |
439.23 |
Vehicle Parking Charges |
Per day Per Vehicle |
|
1st day (Date of entry) |
Free |
Free |
2nd to 7th day |
219.62 |
219.62 |
8th day onwards |
292.82 |
292.82 |
Vehicle Entry fee |
|
|
Commercial Vehicle (Weight <10 MT) |
146.41 |
|
Commercial Vehicle (Weight >10 MT) |
292.82 |
|
Light Vehicle (Weight <5 MT) |
73.21 |
|
Rikshaw/Hand Trolley |
22.63 |
|
Miscellaneous Charges |
|
|
Labour Loading Charges |
2057.00 2420.00 |
|
Bagging Charges (Per MT) |
220.00 |
|
Survey Charges per container |
1210.00 |
|
Description of Activity |
Amount in (NPR) |
|
20' |
40' |
|
CHARGES FOR INDIVIDUAL ACTIVITIES |
|
|
Handling of Loaded Container (Complete Cycle) |
3,993.00 |
5,390.55 |
Handling of Empty Container (Complete Cycle) |
865.15 |
1,331.00 |
Weighment charges |
146.41 |
146.41 |
Transfer of loaded container for survey and other purposes (one time operation) |
1,331.00 |
1,663.75 |
Transfer of empty container for survey and other purposes (one time operation) |
865.15 |
1,331.00 |
Handling of LCL cargo including loading/unloading & stuffing/destuffing (Per MT) |
332.75 |
|
Terminal Handling Charges - Bagged, Break Bulk, Bulk Cargo & Loose Cargo |
|
|
Bagged Cargo/Break Bulk Cargo (Per MT) |
271.04 |
|
Bulk Cargo & Loose Cargo (Per MT) |
399.30 |
|
|
|
|
Storage Charges - Bagged and Break Bulk Cargo |
Per day per MT |
|
1 to 3 days |
Free |
|
4th to 10th day |
93.17 |
|
11th to 30th day |
119.79 |
|
31st day onwards |
186.34 |
|
Open Yard Charges - Bulk & Loose Cargo |
Per day per MT |
|
1st day (Date of unloading) |
Free |
|
2nd to 7th day |
53.24 |
|
8th day onwards |
79.86 |
|
Railway Freight |
|
|
Railway freight to ICD Birgunj from International Border Railway Freight from ICD Birgunj to International Border |
532.40 |
798.60 |
Railway freight to ICD Birgunj from the International Border (Bagged & Break Bulk |
532.40 |
798.60 |
Railway freight to ICD Birgunj from International Border (Bagged & Break Bulk Cargo per MT) Railway |
20.57 |
|
Freight from ICD Birgunj to International Border (Bagged & Break Bulk Cargo per MT) |
20.57 |
|
Railway freight to ICD Birgunj from International Border (Bulk & Loose Cargo per MT) |
15.73 |
|
Railway Freight from ICD Birgunj to International Border (Bulk & Loose Cargo per MT) |
15.73 |
|
Additional Terms: |
||
Hazardous cargo : Rates shall be charged double for hazardous cargo |
||
Over Dimensional Container : 25% extra shall be charged over the normal charges |
||
Cancellation after nomination : Survey Charges of NPR 1,210.00 shall be charged along with Parking & Handling Charges Detention / Stabling Charges levied by Indian Railways on BCN/BRN rakes at Raxaul station shall be on customer account. |
||
Transportation shall be on party account, the customer shall make arrangement for trucks/trailers for taking delivery of the cargo on their own. |
||
It is proposed that on arrival of Bulk & Loose Cargo (BRN rakes), customers shall arrange at least 14 vehicles in advance for taking direct delivery of cargo, otherwise shifting of cargo will be undertaken and charged at the rate of NPR 279.51 per metric ton. |
||
Advance consent of Pristine Valley to be taken for planning a rake into ICD Birgunj for smooth operation and avoid detention. Pristine Valley will not be responsible for any demurrage on BRN rakes carrying Bulk & Loose Cargo, arriving without proper dunnage. |
||
Any Railway Detention accrued on Break Bulk & Bagged Cargo in BCN Rakes for reason beyond the control of Pristine Valley shall be on party's account. |
||
In case the rake is placed on non-working line (stabling line) then any detention/stabling accrued, will be on party account. |
||
It is to be mentioned that iron and steel cargo are to be booked by party on flat wagons only. BOST & other BOXN wagons may be avoided. All Charges to be deposited before taking delivery of cargo/container. |
||
Railway Detention/Stabing Charges are to be paid in INR DD. |
||
Cheque/DD should be in favour of Pristine Valley Dryport Private Limited payable at Birgunj only. |
||
Bank details: Everest Bank Limited, Dryport Branch, Account No. 01500105200331 |
||
Note: VAT shall be charged extra as applicable |
Port Handling Equipment
Port equipment is managed by Pristine Valley Dry port Pvt. Ltd.
Equipment |
Available
|
Total Quantity and Capacity Available |
Comments on Current Condition and Actual Usage |
---|---|---|---|
Dockside Crane |
No |
N/A |
N/A |
Container Gantries |
No |
N/A |
N/A |
Mobile Cranes |
Yes |
8, 60 mt |
Operational and is used for Iron and steel handling |
Reach stacker |
Yes |
3, each of 45 mt capacity 1 of 7 mt capacity for empty containers |
Operational and is used for container handling |
RoRo Tugmaster (with Trailer) |
No |
|
|
Grain Elevator with Bagging Machines |
No |
|
|
Transtainer |
No |
|
|
Forklifts |
Yes |
2, 3 mt each |
Operational |
Container Facilities
With the increase in trade activities every year and without the improvement in existing infrastructure, congestion in the Dry port is an issue. Lack of proper warehousing capacity also is a contributing factor as importers can be late to clear their cargo on time. Importers would rather pay charges for extra days in the dry port facilities than remove their cargo to find themselves without sufficient warehouse space once they collect the cargo. The container holding capacity of the dry port is 1568 containers.
Facilities |
20 ft |
40 ft |
---|---|---|
Container Facilities Available |
1 Container ice Cargo |
1 for bagged Cargo |
Container Freight Station (CFS) |
No but planned to have 3 refrigerated CFS
|
|
Refrigerated Container Stations |
No |
|
Other Capacity Details |
N/A |
|
Daily Take Off Capacity |
3-4 Racks in day |
|
Number of Reefer Stations |
2 plug in for dual service |
|
Emergency Take-off Capacity |
5 fire hydrants around CFS |
|
Off take Capacity of Gang Shift |
N/A |
|
Customs Guidance
ASYCUDA system is used for the customs clearance process. The system generates green, red, or yellow signals. Once the declaration documents are uploaded into the system, a registration number is generated and the verification of documents is done by the inspectors in the port, and the tax and duties are determined. Following the payment of the duties and taxes payable, the final verifier selects the container and marks green/blue and red /yellow. If the containers get green/blue, then it is released. If the containers get red/yellow, it is thoroughly checked. If there is no discrepancy, the goods are released. If any discrepancies are found, additional duties are paid and then the goods are released. Once the examination is completed, it is copied to the Risk Management Unit. It is recommended to use a reputable clearing agent. The clearing of goods takes 2 to 3 business days.
For more information on customs in Nepal, please see the following link: 1.3 Customs Information.
Terminal Information
MAIN STORAGE TERMINAL
ICD has two warehouses (1. Container Freight Station Shed and 2. Good Shed) of size 7,000 sqm and 10,000 sqm. The Good Shed is divided into a walled section of 300m in length and a section with a roof without walls of 400m (as shown below in the pictures). NITBD has completed upgrading rail-based ICD; broad gauge railway yard with 6 full-length lines; boundary wall of 3.15 km. long and 3.6m. and has come into operation with storage and handling facilities to handle bulk cargo.
Main Features of Rail-based ICD:
ICD Birgunj is a rail-linked terminal, 450 m from the Indian border with the facility to handle all types of traffic including containers, bulk, bagged, break bulk, loose cargo, etc. This terminal covers an area of 38 hectares with the following facilities;
-
Railway tracks: 6 full-length railway lines.
-
Covered Good shed: 450 m x 26.5 m.
-
Open Shed/Platform) in addition to covered shed: 300 m x 26.5 m.
-
Container Yard (CY): 685 m x 64 m with 1568 TEU ground slots.
-
Reach Stakers” 3 x 45 Ton + 1 x 7 Ton capacity.
-
Mineral siding: Loose cargo handling facilities.
-
Truck Parking: More than 200 trucks and 50 trailers.
-
High mast lights with generator backup. Electric substation of 630 KVA, 11/0.4 KVA with one 380 KVA D. G. SET; Administrative block of 1130 sq. m. floor area.
-
Administrative block of 1130 sq. m. floor area.
-
Fire detection and alarm system.
-
Cement concrete paved area for parking of 250 freight vehicles and 30 big-size trailers.
Cement concrete paved area for parking of 250 freight vehicles and 30 big-size trailers.
Walled Good Shed of approx. 300 m in length.
Unwalled Good Shed of 400 m in length.
CFS SHED building and area.
CFS SHED building and area.
Port Security
The port is surrounded by a concrete wall. A CCTV monitoring system and security guards are placed in strategic areas to provide surveillance 24/7. Security is provided by Nepal Armed Police Forces of Nepal Government.
Security |
|
---|---|
ISPS Compliant |
No |
Current ISPS Level |
N/A |
Police Boats |
N/A |
Fire Engines |
N/A |
Birgunj Integrated Check Post (ICP)
An addition at the Birgunj ICD is the Integrated Check Post (ICP) to facilitate the customs clearance activities. The ICP Birgunj was inaugurated on 7th of April 2018. As per the legal provision, TRS Himalayan Logipark Pvt Ltd has been awarded for ICP Birgunj terminal clearance purpose on 1st April 2023. Birgunj ICP is currently handling 70 percent of the commerce that used to pass through the Birgunj customs points.
Port website: Bigunj Customs Office
Key port information may also be found at http://www.maritime-database.com
Port Location and Contact |
|
---|---|
Country |
Nepal |
Province or District |
Madhesh / Parsa |
Nearest Town or City with Distance from Port |
TOWN NAME: Birgunj DISTANCE (km): 8 KM |
Port's Complete Name |
Birgunj Integrated Check Post
|
Latitude |
27.016721 |
Longitude |
84.842556 |
Managing Company or Port Authority
|
TRS Himalayan Logipark (P) Ltd. ICP, Birgunj |
Management Contact Person |
Ganesh Prasad Ghimire (Chief Maneger) 9852032047 Subhash Subedi (General Manager) 9855036917 |
Nearest Airport and Airlines with Frequent International Arrivals/Departures |
AIRPORT NAME: Simara Airport 23.4 KM |
Port Picture
Description and Contacts of Key Companies
SN |
Agencies related to Operation of ICP |
Name |
---|---|---|
1 |
Multimodal Transport Operators |
N/A |
2 |
Transport Management Company |
Trans Himalayana Logipark Pvt. Ltd |
3 |
Customs |
Birgunj Customs Office |
4 |
Freight Forwarders |
Upyogi Freight Logistics Pvt. Ltd. , Radhe Radhe Clearing and Forwarding, Flash Freight logistics, Oceanstar Logistics, |
5 |
Banks |
Everest Bank For Customs clearance and Nabil Bank for Terminal Clearance |
6 |
Quarantine |
Food, Animal and Plant with laboratory facility |
7 |
Shipping lines |
N/A |
8 |
Customs Agent |
Trimurti Clearing Sewa, Laxmi Clearance Agent, Adit Clearance Agent, Aani Clearance Agency, Aashirbad Clearance Agent ete. |
For more information on port contacts, please see the following link: 4.4 Port and Waterways Companies Contact List.
Port Performance
Customs clearance certificates are usually issued to cargo only after 6 pm from the Birgunj Customs office. The cargo truck that enters ICP in the daytime has to hold until 6 pm to exit the customs office premises. This leads to congestion at the gate and ICP premises throughout the day. Also, importers who do not have their warehouses outside of the ICP premises tend to delay the customs clearance procedures to tranship their cargo from truck to truck without having to store their goods in a warehouse and pay additional charges (warehouse charges are applicable if stored in ICP warehouse). Therefore, the parking bay is full most of the time. The exit road is also congested due to trucks standing in queue for the whole day until 6 pm. These are the factors causing congestion at the ICP.
Seasonal Constraints |
||
---|---|---|
|
Occurs |
Time Frame |
Rainy Season |
Yes |
From June to August |
Major Import Campaigns |
Yes / No |
Months of Festivities October/November |
Other Comments |
ICP is functioning at full capacity with the facility of 6 6-lane road. |
Handling Figures for 2022 |
|
---|---|
Vessel Calls |
N/A |
No of Vehicles Traffic (TEUs) |
135063 Imports 10140 Exports |
Handling Figures Bulk and Break Bulk for 2022 |
|
---|---|
Bulk (MT) |
21998 |
Break bulk (MT) |
N/A |
Discharge Rates and Terminal Handling Charges
For information on port rates and charges, please see the following link: Fee-Dar-rate-for-ICP-Birgunj-2.pdf (nitdb.gov.np).
Port Handling Equipment
The port equipment is managed by the TRS Himalayan Logipark (P) Ltd.
Equipment |
Available
|
Total Quantity and Capacity Available |
Comments on Current Condition and Actual Usage |
---|---|---|---|
Dockside Crane |
No |
|
|
Container Gantries |
No |
|
|
Mobile Cranes |
Yes |
|
|
Reach stacker |
Yes |
|
|
RoRo Tugmaster (with Trailer) |
No |
|
|
Grain Elevator with Bagging Machines |
No |
|
|
Transtainer |
No |
|
|
Hydra |
Yes |
2 |
Operational |
Forklifts |
Yes |
1 with 3 mt |
Operational |
Customs Guidance
ASYCUDA system is used for the customs clearance process. The clearing of goods takes 2 to 3 business days.
Terminal Information
MAIN STORAGE TERMINAL
-
Warehouse with refrigeration facility (import side) - approx. 1374 m 2
-
Warehouse (export side) – approx..692 m 2
-
Inspection shed (import side) – approx. 402 m 2
-
Inspection side (export side) – approx. 234 m 2
-
Confiscated shed (import and export side) – approx. 100 m 2
-
Animal sheds (import side) – approx. 100 m 2
-
Processing sheds – total 6 no with approx. 1250 m 2 each
-
Processing cabins: 16 No, Frisking cabins: 4 No,
Port Security
Port security is overseen by the Nepal Armed Police Force and an additional security company 24/7. The facilities covering the area of 115 acres is well barricaded. As a firefighting measure, there is a firefighting system complete with 5 pumps, water storage, supply lines, and hydrants in strategic locations within the premises.
Security |
|
---|---|
ISPS Compliant |
No |
Current ISPS Level |
N/A |
Police Boats |
N/A |
Fire Engines |
N/A |
Nos of Weighbridge- 2 with capacity of 80 MT and 100 MT. |
Inspection building.
|
Open yard.
|