Port Overview
Biratnagar Integrated Check Point (ICP) is spread over a total area of about 186 acres along the Nepal-India borders constructed by India and handed over to Nepal to facilitate for trade logistics between the two countries. It has a common platform for traders to get customs clearance for traded goods and offers services like banking, immigration, quarantine, warehousing, parking yard, etc facilitating both importers and exporters.
Biratnagar ICP is 7 kilometers (4 mi) North of Nepal's southern border with Bihar state, India. Biratnagar Customs Office ranks 4th in the overall volume of trade in Nepal after Birgunj Customs, Bhairahawa Customs, and Birgunj Dry Port. There are nine sub-customs offices under its jurisdiction. Major imported goods through this custom are petroleum products like diesel, petrol, LP gas, crude soya-bean oil, motorcycles, betel nuts, M.S. Billets, iron structures, coal, and glazed tiles. Major exported goods are cardamom, woven fabrics, jute sacking bags, G.I.Wire, PP GI Coil, Dyed Yarn, jute hessian fabric, brass strip in Coils, and corrugated galvanized iron sheets. Biratnagar ICP at the border is well connected to the gateway ports of Kolkata (600 km) by road or by rail to Jogbani, Bihar.
Port website: ICP Biratnagar – Trans Nepal Freight Services (transnepaldryport.com)
Port Location and Contact |
|
---|---|
Country |
Nepal |
Province or District |
Koshi Province, Morang district |
Nearest Town or City with Distance from Port |
7 km North of Biratnagar City accessed Via H08 |
Port's Complete Name |
Biratnagar Integrated Check Point |
Latitude |
26.38237 |
Longitude |
87.26900 |
Managing Company or Port Authority
|
TransNepal Freight Services Pvt. Ltd |
Management Contact Person |
Anand Kumar Singh TransNepal Tower Head Office Piyush Marga, Biratnagar-5, Morang,Nepal Tel: 021-501441 Fax: 021-501470 E-mail: ananda@transnepaldryport.com
Laxmi Subba Manager ICP Biratnagar, Buddha Nagar Mobile: 9842032956/9814387011
|
Nearest Airport and Airlines with Frequent International Arrivals/Departures |
Biratnagar National Airport 12 KM North |
Port Picture
Aerial View of Biratnagar ICP |
Description and Contacts of Key Companies
SN |
Agencies related to Operation of ICP |
Name |
---|---|---|
1 |
Multimodal Transport Operators |
TransNepal Freight Services Pvt. Ltd |
2 |
Transport Management Company |
N/A |
3 |
Customs |
Biratnagar Customs Office |
4 |
Freight Forwarders |
N/A |
5 |
Banks |
Rastrya Banijya Bank,Rani, Buddhanagar ICP Branch |
6 |
Quarantine |
Plant, Animal, Food Quarantine, Lab |
7 |
Shipping lines |
N/A |
8 |
Customs Agent |
Mrigatrishna clearing, Bijay clearing, Shah clearing, Devekinandan clearing, Eastern clearing, Danfe Custom Clearing, D.G Custom Service, Shivam Clearing House, Rani Clearing services, Pathivara Bhansar Sewa, D.P Clearing services, Trans misson cargo clearing, P.R Regmi bhansar jach pass sewa, Gupta Custom Clearing, Goodwill Clearing & Logistics Service etc (50+ agents are providing customs clearance services) |
For more information on port contacts, please see the following link: 4.4 Port and Waterways Companies Contact List.
Port Performance
The Port is currently not congested and operates on a two-lane road. The average waiting time between arrival and berthing is 1 to 2 days.
Seasonal Constraints |
||
---|---|---|
|
Occurs |
Time Frame |
Rainy Season |
Yes |
From June to August |
Major Import Campaigns |
Yes |
Months of Festivals Aug to Oct |
Other Comments |
ICP Biratnagar is in operation merging Rani customs offices. |
Handling Figures for 2022 |
|
---|---|
Vessel Calls |
40 |
Container Traffic (TEUs) |
6651 |
Handling Figures Bulk and Break Bulk for 2022 |
|
---|---|
Bulk (MT) |
71340 |
Break bulk (MT) |
|
Discharge Rates and Terminal Handling Charges
Biratnagar ICP Tariff effective from 17 August 2022 and following is the Discharge Rates and Terminal Handling Charges: Tariff – Trans Nepal Freight Services (transnepaldryport.com)
Port Handling Equipment
The port equipment is managed by the operator. The port has transitioned from using manual labour to handle cargoes to mechanical port handling equipment as the volume of cargoes passing through increases.
Equipment |
Available |
Total Quantity and Capacity Available |
Comments on Current Condition and Actual Usage |
---|---|---|---|
Dockside Crane |
Yes |
40 ton |
|
Container Gantries |
N/A |
|
|
Mobile Cranes |
Yes |
Escorts F-15 |
Capacity 14 ton at 1.5 m, 900 kg at 15.8 m |
Reach stacker |
Yes |
1 – 14 MT. |
|
RoRoTugmaster (with Trailer) |
N/A |
|
|
Grain Elevator with Bagging Machines |
N/A |
|
|
Transtainer |
N/A |
|
|
Forklifts |
Yes |
One, 3000kgs |
|
Pallet Trolly |
Yes |
Four, 5000 kgs, 3000 kgs |
|
Container Facilities
The space available for the container is sufficient, but the Port does not have a refrigerated container station and storage related to cold storage.
Facilities |
20 ft |
40 ft |
---|---|---|
Container Facilities Available |
N/A |
N/A |
Container Freight Station (CFS) |
N/A |
N/A |
Refrigerated Container Stations |
N/A |
N/A |
Other Capacity Details |
N/A |
N/A |
Daily Take Off Capacity |
N/A |
N/A |
Number of Reefer Stations |
1 with 4 plugs in facility (Dual service for both 20 dt and 40 ft) |
|
Emergency Take-off Capacity |
N/A |
N/A |
Off take Capacity of Gang Shift |
N/A |
N/A |
Customs Guidance
The customs clearance process at the dry port of Biratnagar is automated using the web-based ASYCUDA system, which allows for the pre-clearing of goods. Customs pre-clearance of goods takes approximately 1-2 working days. The location of the Customs office is within the dry port.
MAIN STORAGE TERMINAL
The Port has a warehouse, parking, and open yard areas as listed below. The port does not have cold storage facilities and does not have a specific area designated for humanitarian cargo.
-
Warehouse arrival with refrigeration facilities (import side) with a capacity of 1520 sqm
-
Warehouse departure (export side) with 740 sqm
-
Animal shed (import side) 100 sqm, Process shed (import side) 2500 sqm, Process shed (export side) 2500 sqm, Process Cabins 31 Nos 418 sqm.
-
A vacant area for adding up to 3,900 m2 warehousing/parking area for holding 150 TEUs.
-
A parking area for 80 trucks
-
Dedicated shed- 1
-
Weight bridge- 2 (1 on the import side and 1 on the export side)
-
Electrical Sub-Station equipment: Two DG Sets, One 380 KVA and 125 KVA Transformer, AVR, LT, and HT panel)
-
Warehouse house Arrival (with refrigeration) facilities (Import Side- 1520 m2
-
Warehouse house Departure (Export Side- 740 m2
-
Process Shed (Import Side) 2500 m2
-
Process Shed (Export Side)- 2500 m2
-
Process Cabins 31 Nos. - 418 m2
-
Firefighting systems including pumps (5 Nos) water storage, supply lines, and hydrants.
Storage Type |
Number of Storage Facilities |
Area (m2) |
---|---|---|
Bagged Cargo |
warehouse |
1375 |
Refrigerated Cargo |
N/A |
|
General Cargo |
Container Cargo New warehouse |
3700 |
Port Security
The port is surrounded by a concrete wall. A CCTV (95 nos.) monitoring system and security is provided by the Nepal Armed Police Forces of Nepal Government and a third-party security company from Sudarshan Security Pvt. Ltd 24/7.
Integrated Check Post (ICP) Biratnagar It is 2.9 Km South of Biratnagar ICP and 14.8 Km South of Biratnagar Airport.
View of ICP from the main building.
Warehouse and parking area
Container yard for railway Container Yard-1 of 4500 m2 is under construction.
Crane, forklift and reach stacker Service
PROCESSING SHED
QUARANTINE BLOCK COOL ROOM