2.1.3.5 Philippines - Mindanao Port of Liloy
Port Overview
The Port of Liloy is located in Lamao, Liloy, Zamboanga del Norte. 127 kms from Dipolog City, the Port of Lamao can be traversed through the coastal road network of Zamboanga del Norte. It has 1 RORO ramp with a draft of 10 meters; 2 R.C. piers, one with a draft of 6 meters and the other between 6 to 15 meters; and a back-up area yard of 3,550 sqm.
Port website: http://pmozamboangadelnorte.com/port-profile/tmo-liloy/
Key port information can also be found at: http://www.maritime-database.com
Port Location and Contact |
|
---|---|
Country |
Philippines |
Province or District |
Zamboanga Del Norte (Region IX) |
Nearest Town or City with Distance from Port |
Dipolog City (127 km) |
Port's Complete Name |
TMO Liloy / Port of Lamao |
Latitude |
8.137775 |
Longitude |
122.678599 |
Managing Company or Port Authority |
Philippine Ports Authority |
Management Contact Person |
Romeo C. Buenaobra – OIC TMO Liloy Salvador L. Delina, Port Manager +63 64 213-6595 / 213-3606 PMO Zamboanga Del Norte |
Nearest Airport and Airlines with Frequent International Arrivals/Departures |
Dipolog Airport Domestic airlines only (PAL, Cebu Pacific) |
Port Picture
Description and Contacts of Key Companies
Company | Address | Contact Information | Services |
---|---|---|---|
Liloy Cargo Handling Services Inc | Port Area, Barangay Lamao, Liloy, Zamboanga Del Norte | Ms Jean Lim, +63 917 3290868 | Stevedoring |
Evergood Delivery & Freight Services Corp. | Galas, Dipolog City | George Ryan Lim, +63 912 338 1962 | Transport, cargo forwarding, hauling, and trucking |
For more information on port contacts, please see the following link: 4.4 Port and Waterways Companies Contact List.
Port Performance
Based on the 2018 PPA report, TMO Liloy has cargo throughput of 12,750 MT for the 1st quarter and 23,805 MT for the 2nd quarter.
https://www.ppa.com.ph/sites/default/files/qtr_stat/2018%20Cargo%20Statistics.pdf
SEASONAL CONSTRAINTS |
||
---|---|---|
Occurs |
Time Frame |
|
Rainy Season |
Yes |
June to November |
Major Import Campaigns |
No |
N/A |
Other Comments |
N/A |
HANDLING FIGURES for 2020 |
|
---|---|
Vessel Calls |
42 |
Container Traffic (TEUs) |
None |
Handling Figures Bulk and Break Bulk for 2020 |
|
---|---|
Bulk (MT) |
58,058 MT |
Break bulk (MT) |
None |
Discharge Rates and Terminal Handling Charges
For information on port rates and charges, please see the following link: http://pmozamboangadelnorte.com/port-tariff/tmo-liloy-tariff/
Berthing Specifications
Type of Berth |
Quantity |
Length (m) |
Maximum Draft (m) |
Comments |
---|---|---|---|---|
Conventional Berth |
3 | 174 m | 10 m |
1 berth with Roro ramp |
Container Berth |
0 |
|
||
Silo Berth |
0 |
|
||
Berthing Tugs |
0 |
|
||
Water Barges |
0 |
|
General Cargo Handling Berths
Cargo Type |
Berth Identification |
---|---|
Imports - Bagged Cargo |
2 & 3 |
Exports - Bagged Cargo |
2 & 3 |
Imports and Exports - RoRo |
1 (9 x 10 m) |
Other Imports |
None |
Port Handling Equipment
The port equipment is managed by the PPA.
Equipment |
Available |
Total Quantity and Capacity Available |
Comments on Current Condition and Actual Usage |
---|---|---|---|
Dockside Crane |
No |
||
Container Gantries |
No |
||
Mobile Cranes |
No |
||
Reachstacker |
No |
||
RoRo Tugmaster (w/ Trailer) |
No |
||
Grain Elevator w/ Bagging Machines |
No |
||
Transtainer |
No |
||
Forklifts |
Yes |
2 | 2.5 ton capacity |
Container Facilities
There are no container facilities in the Port of Liloy.
Customs Guidance
Custom clearance must be filed and cleared at Port of Zamboanga Customs Office.
Contact:
Segundo Sigmund Freud Z. Barte, Acting District Collector
Port of Zamboanga
segundosigmundfreud.barte@customs.gov.ph
+63 62 992 6844
For more information on customs in the Philippines, please see the following link: 1.3 Customs Information.
Terminal Information
Multipurpose Terminal
- Back-up Area 3,120 sq. m.
- Vehicle Parking Area 45 sq. m.
- Cargo Handling Equipment
- Other port facilities / amenities
- Fenders: V-type 500H x 1500L = 42 units
- Power Plant Station: 30 sq. m.
- Two (2) units 2.5 tonner forklift
Grain and Bulk Handling
There are no grain and bulk handling facilities in the Port of Liloy.
Main Storage Terminal
There are is no main storage terminal in the Port of Liloy.
Stevedoring
Stevedoring is managed by the PPA.
Hinterland Information
Cargo owners are responsible for withdrawal and transport.
Port Security
The Port of Liloy has locally-hired security guards.
Security |
|
---|---|
ISPS Compliant |
Yes |
Current ISPS
Level |
Level 1 |
Police Boats |
None |
Fire Engines |
Provided by the local government |